Former United Airlines Maintance Hub –
Administration Bldg
Complete renovation of entire bldg. –
Project had to work around Airport Data
Center and Security Command/Control
that was housed onsite.
~ $28 MM Overall Budget
State of the Art Pharmacy Distribution
Center, Full Service Cafe and Call-Center
Operations
Automated pill dispensing, conveying system and warehouse distribution area with 2 inbound, 3 outbound truck docks as well as separate high efficiency air compressor out building.
Owners Rep/Project Management
Project2
~280,000 sq. ft. industrial location
Numerous projects in existing ~120,000
sq. ft. space which included: Office
space renovation into warehouse,
engineering offices and OTC (Over the
Counter Distribution line) as well as an
160,000 sq. ft. expansion into adjacent
lease space, which included ~20,000
mezzanine, industrial walk-in (pallet)
coolers and freezers, state of the art